Nubian Mining Company continues to make positive strides in the mining sector

NMC’s Exploration Department has announced significant progress in excavation activities. They have successfully completed 14 holes drilled by (DD Drilling) with 4259 m in depth 736 samples ,11 holes drilled by(RC Drilling) with 2021 m in depth 2098 samples and 2466 (QAQC Samples) and 4 trenches with 305 m in depth ,225 samples and 264 (QAQC Samples).As a result of these operations, a total of 26640 samples. These samples have undergone meticulous examination and analysis by the esteemed ISK Laboratory and ALS Laboratory, ensuring accurate and reliable findings.